Both restrooms were gutted. All that remains are the walls. When this project is complete, there will be up-to-date, attractive restrooms for your use.
All fixtures, flooring, wall covers were removed
The floor has been floated
Most of the piping has been installed
Vanity frames have been installed
A large portion of the sheetrock has been installed
What needs to be done
There is a lot to be done to make these restrooms beautiful
Installing remainder sheetrock
Installing the remainder of the piping
Installing all commodes and urinals
Installing flooring
Installing tile
Installing vanities, faucets, mirrors, and paper product holders